Vance AFB Flume

Vance AFB, OK

  • Contract Amount – $495,000.00
  • Period of Performance – July 11-Current
  • POC – Rick Murrow – 580.213.6054
  • USAF
  • The project consists of a drainage flume at the northwest end of runway 17C. The flume is approximately 3700 LF long. The project involved earthwork, soil stabilization, concrete mudslab, CIP walls, aggregate, seeding, and sodding.