Projects Prev Next

DSCC Raised Flooring

Columbus, OH

  • Period of Performance :  March 2012 – June 2012
  • We removed the existing raised floor, rehabilitated the concrete, did line and grade layouts, and replaced with a new raised floor at the Defense Supply Center.
  • We also demo'd  walls and reconstructed  them in new locations.

advantage pic 4
Call Today 940.320.9520
advantage pic 5
6101 Long Prairie Rd., Ste. #744, #150
Flower Mound, Texas 75028