Projects Prev Next

DSCC Miscellaneous Floor Repairs

Columbus, OH

  • Period of Performance :  November 2012 – March 2013
  • We stripped, sanded, and resealed all the Terrazzo flooring on the first floor and all the elevator lobbies on floors 2-7.  
  • We replaced the transition strips and cove base for same.  
  • We also replaced carpet in a corridor and  Sundry room on the 3rd floor

advantage pic 4
Call Today 940.320.9520
advantage pic 5
6101 Long Prairie Rd., Ste. #744, #150
Flower Mound, Texas 75028