Projects Prev Next

Big Bend Power Plant Draft Tube Sealing

Ft. Thompson, SD

  • Period of Performance : October 2010 through November 2010
  • This project involved replacing the joint sealants in the existing concrete pavement.

advantage pic 4
Call Today 940.320.9520
advantage pic 5
6101 Long Prairie Rd., Ste. #744, #150
Flower Mound, Texas 75028