Projects Prev Next

7th-8th Floor Additions – Midwest Regional Hospital

Midwest City, OK

  • Contract Amount – $2,075,755.00
  • Period of Performance – May 2009 – February 2010
  • Prime Contractor – MJ Harris
  • POC – Jeff Hendricks – 205.281.1270
  • The project consists designing the structural support of the slabs without utilizing the roof. All loads had to be designed to be supported by columns. Construction consisted of stripping the old roof, pouring new structural columns, beams and elevated slabs. All work was done on the existing hospital while it remained in service.

advantage pic 4
Call Today 940.320.9520
advantage pic 5
6101 Long Prairie Rd., Ste. #744, #150
Flower Mound, Texas 75028